Abakan Thermal Power Station Has Been Put into Operation
On December 19, 2014, according to the Protocol of Integrated Tests, System of Monitoring Engineering Systems of the "New unit of Abakan Thermal Power Station" as a part of FKU "Center of Crisis Situations Management, Ministry of Emergencies of Russia in the Republic of Khakassia", Abakan Thermal Power Station was agreed to be put into regular operation.
A structured system of monitoring and control of engineering systems of buildings and facilities (SMES*) of Abakan Thermal Power Station passed all tests within the program of complex tests of SMES of the facility composed of Center of Crisis Situations Management. The SMES proved to be workable and meets all the requirements and the list of input and output messages of SMES. Conjugation of SMES of Abakan Thermal Power Station with FKU "Center of Crisis Situations Management, Ministry of Emergencies of Russia in the Republic of Khakassia" is workable and fully complies with the conjugation specifications.
*SMES is Structured System of Control and Monitoring Engineering Systems of Buildings and Facilities.